Seabrook, TX – Terminal Facility

Aura Engineering completed the process, mechanical, electrical, civil, and structural engineering design of a 1.5 million bbl expansion at the Seabrook Terminal facility located along the Houston Ship Channel. This facility expansion consisted of ten (10) new above ground internal floating roof storage tanks and was designed with a redundant pump manifold capable of flow rates up to 30,000 barrels per hour (bph). The pumps are 4,160 volt, vertical can-style pumps operated on VFDs. The facility is designed to accept inbound movements from ships and also send outbound movements via pipeline. Aura Engineering provided the vapor control system design which is in compliance with the US Coast Guard regulations for loading marine vessels.

2020-08-19T11:01:46-05:00
Suite of Services Brochure

DOWNLOAD Suite of Services

or see the online flipbook HERE

COVID-19 Action Plan

Our COVID-19 Action Plan

We are here to help.  See Our Plan

This website uses cookies and third party services. Ok