Aura Engineering completed the design and coordinated the construction effort of a 120,000 bpd crude oil midstream terminal and booster pump station on a green field site near Three Rivers, Texas. The facility consists of four (4) unloading LACT units covered by a canopy,  inbound and outbound metering skids, product booster pumps and mainline facility outbound pumps.  The two (2) 1500HP mainline pumps transport up to 120,000 bbl of product per day down a pipeline. The facility includes two (2) 150,000 bbl and (2) 50,000 bbl above ground internal floating roof storage tanks.

Aura also assisted our client with the design, layout, and construction coordination of the facility control room and office building. The control room houses the PLC and terminal automation equipment necessary for accurate billing and volume reconciliation.