Process Hazard Analysis: Your Game Plan for Preventing System Failures

Predictability is the cornerstone of safety and reliability. Predicting problems that might arise within a system is essential to creating a proper maintenance and safety plan that prevents and/or mitigates system failures, environmental releases, and keeps workers and personnel safe. In order to accurately assess the probability of specific hazards, [...]

Process Hazard Analysis: Your Game Plan for Preventing System Failures2020-06-24T20:05:28-05:00

Two Completed Systems During COVID-19

During the same week, Aura commissioned two different types of systems for clients in Texas. Even though these start-ups occurred during COVID-19 travel restrictions, Aura was able to have key people on-site to ensure our clients, deemed essential during these times, were able to commission their new systems as smoothly [...]

Two Completed Systems During COVID-192020-05-26T12:16:17-05:00

Fast, Simple Solutions to Increase Oil Storage Capacity

A historic price crash, coupled with a global public health crisis, have created an extreme demand shock in energy markets across the U.S. and around the world. As a result, storage space, both onshore and offshore, is rapidly filling up. America’s main delivery point in Cushing, Oklahoma is expected to [...]

Fast, Simple Solutions to Increase Oil Storage Capacity2020-05-19T12:09:52-05:00

Stay Prepared with Spare Parts and Maintenance from Aura Engineering

As an essential business, Aura Engineering is at full staff during the COVID-19 crisis, ready to assist our clients with all of the engineering and design services they rely upon. All of our clients in the storage terminal and transfer facility industries are essential businesses as well, but this situation [...]

Stay Prepared with Spare Parts and Maintenance from Aura Engineering2020-04-21T15:53:34-05:00

San Antonio, TX – Turnkey Terminal, Transfer, and Vapor Facility

The facility had an old truck rack in San Antonio, TX that caught fire and was completely destroyed. Aura was hired to complete the turnkey project from design through construction and startup. Our goals were to furnish all engineering, materials, construction, commissioning, and regulatory interface services necessary to construct the [...]

San Antonio, TX – Turnkey Terminal, Transfer, and Vapor Facility2019-04-23T03:27:38-05:00

Corpus Christi, TX – Crude Oil Terminal Facility

Aura Engineering completed the design on a crude oil terminal facility, from the ground up, in Corpus Christi, TX. Our team designed all piping, from the four-stall truck unloading rack to the storage tanks and then on to the barge dock. The unloading rack included LACTs and monitoring equipment; each [...]

Corpus Christi, TX – Crude Oil Terminal Facility2019-04-23T03:28:43-05:00

Scio, Ohio – Automated Propane, Butane, and Natural Gasoline Loading Facility

The Utica project called for designing an automated propane, butane, and natural gasoline loading facility with metering capabilities in Scio, Ohio. This facility is capable of loading eight (8) propane railcars, four (4) butane railcars, four (4) natural gasoline railcars, along with two (2) propane trucks simultaneously. The design flow [...]

Scio, Ohio – Automated Propane, Butane, and Natural Gasoline Loading Facility2019-04-23T03:29:26-05:00

Seabrook, TX – Terminal Facility

Aura Engineering completed the process, mechanical, electrical, civil, and structural engineering design of a 1.5 million bbl expansion at the Seabrook Terminal facility located along the Houston Ship Channel. This facility expansion consisted of ten (10) new above ground internal floating roof storage tanks and was designed with a redundant [...]

Seabrook, TX – Terminal Facility2019-04-23T03:30:48-05:00
COVID-19 Action Plan

Our COVID-19 Action Plan

We are here to help.  See Our Plan